dc.contributor.author | Tekbaş, Hakan | |
dc.contributor.author | Ekici, Mehmet | |
dc.date.accessioned | 2024-03-12T19:38:40Z | |
dc.date.available | 2024-03-12T19:38:40Z | |
dc.date.issued | 2023 | |
dc.identifier.issn | 2564-7377 | |
dc.identifier.uri | https://doi.org/10.31466/kfbd.1207783 | |
dc.identifier.uri | https://search.trdizin.gov.tr/yayin/detay/1212511 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12450/3258 | |
dc.description.abstract | Hoods are the most important devices used in our kitchens that contribute to the ventilation of the environment. 95% of the electric motors used in hoods are single-phase asynchronous motors. There are many domestic and foreign electric motor manufacturers producing for the hood industry. Supplier selection in companies producing hoods is vital and critical for sustainable production. It is extremely important to make the right decision in the purchasing process of the supplied products. While the decisions taken can sometimes be clearly separated from each other, sometimes they can be intertwined and interconnected. Multi criteria decision making techniques are used when making decisions that cannot be clearly separated or explained with numerical data. The aim of this study was to determine the most suitable Supplier for the built-in appliance company operating in the Turkiye/Amasya region by using fuzzyTOPSIS method in the supply of 1-phase asynchronous motors used in hoods. After 5 experts working in the company were determined as decision makers, 4 criteria were determined: quality, system capacity, finance and logistics performance. The best supplier selection among 6 different suppliers was made using this method. For the first time, a solution proposal was presented with the fuzzyTOPSIS technique for the 1-phase induction motor supplier selection and a contribution was made to the literature. | en_US |
dc.language.iso | eng | en_US |
dc.relation.ispartof | Karadeniz Fen Bilimleri Dergisi | en_US |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.title | Determination of Supplier Selection For 1-Phase Induction Motor Used in Hoods by Fuzzy TOPSIS Method | en_US |
dc.type | article | en_US |
dc.department | Amasya Üniversitesi | en_US |
dc.identifier.volume | 13 | en_US |
dc.identifier.issue | 4 | en_US |
dc.identifier.startpage | 1307 | en_US |
dc.identifier.endpage | 1321 | en_US |
dc.relation.publicationcategory | Makale - Ulusal Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
dc.identifier.trdizinid | 1212511 | en_US |
dc.identifier.doi | 10.31466/kfbd.1207783 | |
dc.department-temp | BSH Ev Aletleri Sanayi ve Ticaret A.Ş., Çerkezköy, Tekirdağ, Türkiye Amasya Üniversitesi, Elektrik Elektronik Mühendisliği, Bölümü, Amasya, Türkiye | en_US |